WHY.V     0.255     ▲     2%      Volume:  40651      Day Range:  0.25 - 0.255      Last Updated:  2024-12-22 05:00
Why We Are Unique
Advanced magnesium project with robust PFS with silica, nickel and iron as by-products
Multiple potential cash flow generating projects
High potential gold exploration at past producing Midnight Project
High grade gold mine rejects project with cash flow potential
Full infrastructure in place with roads, water, electricity and natural gas
Strong management and board
Why invest in W.H.Y. Resources
Multiple Streams of Revenue Potential
WHY will produce low cost, high purity, and high margin magnesium products for all industry vertical applications generating diverse revenue with its robust economics
After Tax NPV of $871.8 Million with an IRR of 72.03%.
Initial capital expenditures (“CAPEX”) of $205.4 million including mine preproduction, processing, and infrastructure (access roads and site preparation)
Open pit mine ideally situated in a mining jurisdiction with all required infrastructure
Global demand is accelerating with the USA seeking to stockpile magnesium
Over 225K metric tons of mine rejects already mined, from the many historic mines in the area
Average grade of 2.5 ppm Au
Potential for 18K ounces of gold with over $30M value
High potential of finding high-grade gold mineralization based on historical data
Secured $2.5M flow through funds in Dec 2021 and completed 20,000 feet of drilling during 2022
Historical gold production and 2008 drill hole results reinforce the high potential of the claim